GetProofed for Electrical

Electrical Job Photos: Wiring Before Drywall Proof

Electrical job photos for a panel upgrade: the old panel, the wire runs before drywall, each new outlet and the finished panel, in one shared record.

Start free

Homeowners free · Pros $49/month

Contractor? Start Pro · $49/mo

When the drywall goes up and the stories don't match, who has the proof?

Homeowners Free

Start a project, pick Electrical, and snap the old panel with the cover off, the new wire runs before drywall, each new outlet with its cover plate on, and the finished panel. Invite your electrician by text or email so you're both on the same project, and keep the record of the wiring behind your walls to share whenever you need it.

Electricians $49/mo

Show the wiring before the drywall goes up, check off rough-in, devices and completion as you go, and put the homeowner on the same page with real proof instead of a long text thread. A clear, dated record protects your reputation.

The Electrical photo checklist (4 stages)

  1. Arrival / assessmentPanel with cover off, breaker labels, and the problem outlets.
  2. Rough-inWire runs, boxes, and staples before insulation or drywall.
  3. Devices / trimOutlets, switches, and fixtures installed with cover plates on.
  4. CompletionLabeled panel, everything powered on, inspection sticker if there is one.

In this video

  1. The problem: who has the proof?
  2. Pick Electrical and shoot each stage
  3. Invite your electrician: one shared record
  4. Homeowners free, pros $49 a month
  5. Try GetProofed free

Videos for other trades

Keep the proof of your electrical job

Works in your phone's browser. Nothing to install.

← All trade videos